Description
Industrial Lipstick Cooling Tunnel
Essential for Modern Lipstick Manufacturing
Integrating a cooling tunnel into your production line is crucial for achieving consistent quality in lipstick manufacturing. This unit rapidly lowers the temperature of the freshly filled product, ensuring precise dimensional accuracy and perfect surface finish every time.
Key Features and Benefits:
-
Controlled Solidification: Manages the cooling rate to prevent internal stresses or imperfections in the lipstick bullet, ensuring a smooth application and prolonged shelf life.
-
Hygienic Design: Built with SUS304 stainless steel at all product contact points, the tunnel meets rigorous hygiene standards required for cosmetic and pharmaceutical production, and is easy to clean and maintain.
-
Adjustable Workflow: Features a variable speed conveyor belt, allowing you to fine-tune the cooling time (typically between 1 to 60 minutes) to perfectly match your specific product recipe and production speed requirements.
-
Robust Cooling System: Equipped with a powerful compressor system capable of achieving low tunnel temperatures, ensuring efficient cooling even in demanding production environments.
Technical Specifications Table:
| Parameter | Specification | Source / Note |
|---|---|---|
| Cooling Temperature Range | -10 °C to +10 °C | Typical for cosmetics |
| Freezing Capacity | Can reach -18 °C | For specific requirements |
| Power Supply | 380V / 50Hz (standard) | Industrial standard |
| Conveyor Belt Speed | Adjustable, e.g., 1-15 m/min | Standard feature |
| Construction Material | SUS304 Stainless Steel | Industry standard for hygiene |
| Control System | PLC with Touchscreen HMI | Modern standard |
📜 Schedule virtual airflow visualization test.
💡 Mention your: Target market (EU/US/Global South), Active ingredient, Required throughput.
🔬 Schedule virtual factory acceptance test with our engineers.
🏷️ Request Compliance Audit: Free gap analysis with throughput simulation.
🔍Ready to Eliminate Production Bottlenecks?
💎Need Industrial Production Automation?
✅ GMP Compliance Guarantee
✅ 24/7 Multilingual Support
✅ 24-month performance guarantee
✅ Local technicians in 18 countries
📈Start small, get a free production layout designed for your growth trajectory. Scale smarter with engineering support!
📥Free line configuration for your products, throughput validation testing!
🎓Contact Specialists for Packaging Equipment:
📄 On-Demand Engineering: Product-specific configurations in 1-2 weeks.
🔧 Spare Parts Kits: Region-specific inventory for <24hr delivery.
🧼Compliance Roadmap:
- CE, EAC, ISO 9001 certifications.
- GMP-ready: 316L SS contact parts, CIP/SIP capabilities.
- ATEX options for chemical solvents.



